• Search By Brand
  • Search By SKU
£87.05 3

Cart

Cart
£87.05 3

Cart

Cart
  • All Products

List Price:

£90.02

Your Discount:

Your Price:

HAGER 40A 30mA RCBO LONG LEADS

HAGER 40A 30mA RCBO LONG LEADS

SKU: HAGER ADA140G
SKU Coppied to Clipboard
Category:
Brand:
This product is on backorder; you can still purchase it, but it may be delivered later than the products currently in stock.

Description

Hager ADA140G 1 Module Single Pole Type B 40A 6kA 30mA RCBO is designed for use in 18th Edition, Hager domestic consumer units providing protection for final circuits.

The RCBO combines the overcurrent functions of an MCB with the earth fault functions of an RCD in a single unit.

Hager ADA140G is a single module, single pole and solid neutral device to BS EN 61009-1 and BS IEC 1009-2-2 which has a positive indication for On or Off.

• Protects against earth leakage and against overloads and short circuits
• Removal of functional earth allows a faster neater installation
• Removal of functional earth makes testing easier and quicker
• Bottom din rail clip allows removal with no requirement to remove busbar
• Sensitivity: 30mA
• Breaking capacity: 6kA
• Single Module
• Complies with BS EN61009-1, BS IEC1009-2-2
• Positive Indication for On or Off

Technical Info
Type of pole: Single pole
Curve: B
Rated short circuit breaking capacity Icn AC according IEC60898-1: 6kA
Rated current: 40A
Operational voltage: 127-230V AC
No. of modules: 1
Rated short circuit breaking capacity Icn under 230V AC according IEC60898-1: 6kA
Connection capacity: Rigid = 16mm², Flexible = 10mm²
Flying neutral lead: 300mm

Additional information

Brand

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

200 - 216 Heigham Street,
Norwich, Norfolk
NR2 4TZ
MD Thompson Electrical Wholesale Ltd © 2025
Website by HelloHorizon, products and customers synced in real-time using ShelfSync